Expertise  ·  Five practices

Foundation to final snag.

Five capabilities under one accountable roof, so the firm that pours your raft is the firm that hands you the keys. No hand-off, no second contractor, one snag list.

Plant, reinforcement and a tower crane on a JDCPL site
Structure in progressRCC and aluminium-shuttered systems
5Capabilities
90%Of the active book is high-rise
33Storeys, tallest structure in progress
MIVANAluminium shuttering across multiple sites

Core practice

High-rise residential.

Towers from G+13 to 2B+G+33, in conventional RCC and MIVAN aluminium-shuttered systems. Over 90% of the active book, and the discipline everything else is measured against.

  • Raft and pile foundations
  • Shear-wall and column-beam structures
  • MIVAN monolithic construction
  • Blockwork, plaster and finishing
  • MEP coordination and services shafts
Oro Constella topping out in Lucknow
Oro Constella · Lucknow

Hospitality · Commercial · Institutional

Hotels, commercial
and institutional.

Hotel complexes, malls, offices and teaching hospitals. Buildings where the finish is inspected by a brand auditor or a regulator, and where the programme carries a penalty clause.

  • T. S. M. Medical College, Lucknow  ·  G+6  ·  ₹112 Cr
  • Ramayana Hotel Complex, Ayodhya  ·  ₹30 Cr
  • Hotel ITC Welcome, Prayagraj  ·  ₹10 Cr
  • Anant Raj Mall, Kirti Nagar  ·  New Delhi
T. S. M. Medical College, Lucknow, completed by JDCPL in 2025
T. S. M. Medical College · Lucknow

The same firm that pours your raft hands you the keys.

One contract, one accountable site team, one snag list. No hand-off between a structure contractor and a finishing contractor for you to referee.

Where we began

Turnkey interiors.

Civil, MEP, joinery, stone and finishing under one order, handed over ready to occupy. It is the work the firm was founded on in 1990, and it is still how we close a building.

  • Hotel lobbies, restaurants and banquet floors
  • Developer sample flats and marketing suites
  • Clubhouses and amenity blocks
  • Full private residences
Restaurant fit-out at Hotel ITC Welcome, Prayagraj
Hotel ITC Welcome · Prayagraj

Groundworks

Township & land
development.

Master planning, internal roads, drainage and earthwork. The unglamorous half of a development, and the half that decides whether the towers start on time.

  • Site grading and bulk earthwork
  • Road and pavement works
  • Storm and sewer drainage
  • Water and electrical reticulation
  • Landscaping and external development
Bulk earthwork and site plant on a JDCPL project
Earthwork and site mobilisation

Selected engagements

Industrial buildings.

Factories, warehouses and structural steel, where the structural programme is the whole negotiation and a week of float is worth more than a discount.

  • Pre-engineered and RCC sheds
  • Structural steel fabrication and erection
  • Warehousing
  • Heavy-duty industrial flooring
Reinforcement and formwork on a JDCPL structure in Lucknow
Reinforcement and formwork · Lucknow

06Why We Hold A Cycle

Owned, not hired.

Rented plant is the most common reason a slab cycle slips. Ours sits on our own books, so a site mobilises the week we say it will.

6Tower cranes
3Batching plants
17Material hoists
2,00,000+sq.ft. steel shuttering

Plus an on-site concrete lab on every project. Every pour cubed and tested at 7 and 28 days

The full equipment schedule

Work With Us

Tell us what you are building.

Send the drawings, the site and the timeline. We will come back with how we would deliver it.