The Company · Our story
Thirty-five years, one rule.
Finish what you start. That is the whole of it. It is the sentence the firm was built on in October 1990, and the reason developers hand us a second tower without going back out to tender.

01From the Managing Director
A note on
thirty-five years.
JD Constructions started in October 1990 with one rule that has not changed since: finish what you start.
In thirty-five years the industry has transformed beyond recognition. Reinforced concrete towers replaced low-rises. MIVAN aluminium shuttering compressed slab cycles from years to weeks. Safety standards that were aspirational a decade ago are now baseline. And every cycle has brought new clients, new partnerships and new lessons that no textbook teaches.
What hasn't changed is the discipline behind a single slab pour at five in the morning, the negotiation with a vendor at midnight, and the relationship with a foreman who's been with us for eighteen years.
Today we run eight active sites across Uttar Pradesh and the Delhi NCR, for developers who have, in many cases, returned for a second or a third project. We are honoured by the trust of our clients and proud of every project we've handed over.
Managing Director · JD Contracts Pvt. Ltd.
02Our Story · Our Promise
Taking care of
your dreams.
Seven moments that took the firm from a residential interiors outfit in New Delhi to eight live high-rise sites.
JD Constructions founded in New Delhi. First work: residential interiors.
First high-rise residential project as principal contractor — Puri Pranayam, Faridabad.
Reformed as JD Contracts Pvt. Ltd. (CIN U45400DL2011PTC214287).
Shalimar Gallant, Mahanagar — first JDCPL project in Lucknow. Start of the operational base.
Puri Pranayam wins the NDTV Property Award for Best Luxury Apartment Project.
Belvedere Court III handed over — 7,00,000 sq.ft., a ₹100 crore project.
Eight active sites across Uttar Pradesh and the Delhi NCR. 35+ years, 3,500+ properties delivered.
Scroll the timeline
03Leadership · Ownership
Thirty-five years,
one Managing Director.
Mahendra Singh
Managing Director · Co-founder
Founded JD Constructions in October 1990 and has led it ever since, through the firm's move into high-rise residential work and into MIVAN-shuttered systems. Every contract JDCPL signs is signed by him.
The discipline of finish what you start that defines the firm is his.
Structure
Private Limited Company · Incorporated 2011
CIN
U45400DL2011PTC214287
Registered office
Neb Sarai, New Delhi 110068
04Our People
The crew behind
every active site.
178 people on the payroll, and past them a sub-contractor bench many of whom are into their second decade with the firm. On any given morning, 1,200+ are on site.
Across all eight active projects, under direct JDCPL supervision. The number moves with the pour calendar.
Many of our senior foremen and supervisors have worked with JDCPL for over ten years — institutional memory we have invested in deliberately.
Steel fabrication and binding · Aluminium and conventional shuttering · Brickwork · Plaster · Electrical · Plumbing · Woodwork · Stone & tile · Painting · False ceiling
05Equipment · Capacity
Owned, not hired.
Six tower cranes, three batching plants and seventeen hoists on our own books. It is capital tied up on purpose: it means a slab cycle answers to our schedule, not to the rental market's.
Material handling
Concreting
Reinforcement & formwork
Power & groundwork
An on-site concrete lab on every project · Every pour cubed and tested at 7 and 28 days
06Site Discipline
How a JDCPL
site runs.
Three standing disciplines, applied identically on a ₹7 crore finishing package and a ₹146 crore tower. The full protocols run to six points each and live in the profile.
Safety.
Every worker who arrives on a site goes home the same day.
Site induction is mandatory
Every worker — direct or sub-contracted — goes through a documented site induction before lifting a tool. Refresher every 90 days.
PPE is provided, not requested
Hard hats, safety harnesses, full-grip footwear, gloves and ear protection issued at site entry. Random compliance audits weekly.
Incident reporting is blameless
Near-misses are logged and reviewed every Saturday by the site engineer and project manager. The protocol is updated, not the person blamed.
Quality.
Most defects on a high-rise are not built — they are allowed.
In-house concrete testing
On-site lab with compression testing machines, cube moulds, slump cones and aggregate gradation kit. Every pour cubed and tested at 7-day and 28-day intervals.
Three-stage formwork checks
Line, level and plumb verified at three independent stages before concrete is approved. Documented sign-off by site engineer and senior supervisor.
Snag-free handover protocol
Internal snag list closed before client walkthrough. Finishing trades audited room-by-room. Defect liability period serviced with a named site engineer.
Environment.
The loudest, dustiest intervention in any neighbourhood, run quietly.
Dust suppression is continuous
Wheel-wash facilities at every entry. Construction dust covered with green netting at all heights. Water sprinklers across active levels twice daily.
Water is recycled, not wasted
Curing water captured and re-used. Concrete washouts contained, never discharged. Site runoff filtered through silt traps before exit to drains.
Scrap is sorted, not dumped
Steel offcuts returned for re-fabrication. Cement bags compacted. Plastic and packaging separated for authorised recyclers. We weigh what leaves the site.
ISO 9001:2015 certified · Every pour cubed and tested at 7 and 28 days
ISO 9001:2015 certified.
Quality management system assessed for civil construction, real estate and land development, contracting, consultancy and housing project services.
Work With Us
Thirty-five years is the reference.
Ask us for client contacts on any project in the list. A track record you cannot ring up is just a brochure.